CHAPTER 3 INSTALLATION
3.1 GENERAL
This Chapter contains instructions for initial inspection, preparation for use and repackaging for shi
p-
ment
. Connection to PC, setting the communication port and linking Genesys
TM
power supplies are d
e-
scribed in Chapter 7.
3.2 PREPARATION FOR USE
In order to be operational the power supply must be connected to an appropriate AC source. The AC
source voltage s
hould be within the power supply specification. Do not apply power before reading
Section 3.6 and 3.7.
Table 3
-
1 below, describes the basic setup procedure. Follow the instructions in Table 3
-
1 in the s
e-
quence given to prepare the power supply for use.
Ste
p no.
Item
Description
Reference
1
Inspection
Initial physical inspection of the power su
p
ply
Section 3.3
2
Installation
Installing the power supply,
Ensuring ad
e
quate ventilation.
Section 3.4
Section 3.5
3
AC source
AC source
requirements
Connecting the power supply to the AC source
Section 3.6
Section 3.7
4
Test
Turn
-
on checkout procedure.
Section 3.8
5
Load conne
c
tion
Wire size selection. Local/Remote sensing.
Single or multiple loads.
Section 3.9
6
Default setting
The pow
er supply setting at shipment.
Section 7.2.4
4.4.1, 3.9.4
Table 3
-
1: Basic setup procedure
3.3 INITIAL INSPECTIONS
Prior to shipment this power supply was inspected and found free of mechanical or electrical defects.
Upon unpac
k
ing of the power supply, i
nspect for any damage, which may have occurred in transit.
The inspection should confirm that there is no exterior damage to the power supply such as broken
knobs or conne
c
tors and that the front panel and meters face are not scratched or cracked. Keep all
packing material until the inspection has been completed. If damage is detected, file a claim with ca
r-
rier immediately and notify the TDK
-
Lambda Americas Inc. sales or authorized service facility nearest
you.
3.4 RACK MOUNTING
The Genesys
TM
power supply
series is designed to fit in a standard 19” equipment rack.
3.4.1 To install the Power Supply in a rack:
1.
Use the front panel rack
-
mount brackets to install the power supply in the rack.
Genesys
TM
power supplies generate magnetic fields, which
might affect the operation of other instruments. If your equi
p-
ment is susceptible to magnetic fields, do not position it adj
a-
cent to the power supply.
NOTE