EasyManua.ls Logo

Terex RT700 - Power Up Self-Test Procedure

Terex RT700
404 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...



GREER COMPANY 1918 EAST GLENWOOD PLACE, SANTA ANA, CA 92705 PN W450250 Rev A 06/01/00
TEREX RCI 510 RATED CAPACITY INDICATOR OPERATOR'S MANUAL TEL:(714) 259-9702 FAX:(714) 259-7626
9 of 35

Immediately following electrical power up or following operation of the
TEST
switch (item 26), the system
executes a self-test that last for 8 seconds. During this time, the numerical display segments and
bar graph segments are all turned on, the audible alarm will sound, and alarm indicator lights are
illuminated.
The information display shows the crane model and rating chart number.
TEST


I8
888;800
I88.8
26
    
  
 
888;800
I88.8
I88.8

Table of Contents

Related product manuals