GREER COMPANY 1918 EAST GLENWOOD PLACE, SANTA ANA, CA 92705 PN W450250 Rev A 06/01/00
TEREX RCI 510 RATED CAPACITY INDICATOR OPERATOR'S MANUAL TEL:(714) 259-9702 FAX:(714) 259-7626
19 of 35
Before choosing the point of lift, check that the correct winch has been selected.
Always check the point of lift selection following selection of the winch.
Choose the point of lift to be either from the
main boom, auxiliary head, or jib by pressing
the
point of lift
push button
(item 14).
This action moves the selected lifting point
to the next available lifting point, i.e. from jib
to aux head, from aux head to main boom,
and from main boom back to jib again.
If an option is not available, it will be
skipped over.
If no other pick point options are
available, the message "No other pick
point options" will be displayed on the
information screen (item 1).
TEST
6
23,500
i2,300
44.8
62.7
26.4
1
14
!!!"
#
$
$