14 Performing the measurement
62
If the Draught measurement parameter is enabled in the reading
display, a draught measurement is automatically started in parallel to
the flue gas measurement. In the List measurement data view, the
parallel draught measurement can be stopped/restarted. This draught
measurement is performed separately to a measurement of the
Draught measurement type.
For the draught measurement, the minus connection for differential
pressure measurement must be free (ambient pressure, not closed).
Tap on the draught reading display or next to it.
Automatic display after connection of one or more Smart Probe testo 115i
or testo 915i during flue gas measurement
If several temperature probes are connected in total (external probes and/or
testo 115i or testo 915i), the temperature probes are used for flue gas
measurement according to the following procedure.
The AT probe = external cable probe always has first priority.
Connected cable probe
(maximum 1 possible)
Number of connected Smart
Probes
(testo 115i and/or testo
915i)
Display and use of the
temperature probe in testo
300 NEXT LEVEL
t115i: additional
temperature channel T
t915i: AT probe for the AT
measurement
Cable probes: AT probe for
the AT measurement
Cable probes: AT probe for
the AT measurement
t115i/ t915i: additional
temperature channel T
Internal temperature sensor
t300 NEXT LEVEL: AT
probe for the AT
measurement
t115i/t915i: additional
temperature channel dT