EasyManua.ls Logo

TGW NBC - NBC Air Take-Up and Tensioning

Default Icon
129 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NBC™ Flat Belt - IOM
P/N: 1118140 Rev: 07/29/2020 Page 39 of 129
NBC AIR TAKE-UP
1.18: 500 LB.-AT. AND 250-AT30 DRIVE TENSIONING (AIR TAKE-UP)
Step 1
With primary air pressure on and belt installed, slide air shutoff switch forward to engage the air
tension on the belt (shown). The belt tension will automatically adjust.
NOTE: FOR 250-AT30 DRIVE ONLY
The 250-AT30 drive has a regulator prior to the air shut off slide sleeve.
The accumulation pressure from the conveyor filter regulator (40PSI) is reduced to 30 PSI.
The 250-AT30 drive air take-up pressure should never exceed 30 PSI.
500 LB.-AT Air Sleeve Valve Assembly

Table of Contents

Other manuals for TGW NBC

Related product manuals