ProcedureforCuttingDeckCircuitPressureTest
CAUTION
Preventpersonalinjuryand/ordamagetoequipment.Readall
WARNINGS,CAUTIONSandPrecautionsforHydraulicTestingatthe
beginningofthissection.
1.Makesurehydraulicoilisatnormaloperatingtemperaturebyoperating
themachineforapproximatelyten(10)minutes.Makesurethehydraulic
reservoirisfull.
2.Parkmachineonalevelsurfacewiththecuttingdecksloweredandoff.Make
sureengineisoffandtheparkingbrakeisengaged.
3.Raisehoodtoallowaccesstodeckcontrolmanifold.
g308384
Figure73
1.T estportG1(decks2,3,&5)2.TestportG3(decks1&4)
g308385
Figure74
1.T estportG1(decks2,3,5&7)2.T estportG3(decks1,4&6)
4.Install350bar(5000PSI)pressuregaugewithhydraulichoseattachedto
deckcontrolmanifoldtestportforthecuttingdeckcircuittobetested(Figure
73orFigure74).
Groundsmaster
®
4500-D/4700-D
Page5–63
HydraulicSystem:Testing
19245SLRevA