EasyManua.ls Logo

Toro Reelmaster 5510-D - Page 336

Toro Reelmaster 5510-D
662 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InstallingtheLiftCylinder(continued)
theoneend)throughtheliftcylinderandliftarm.Installthesecondthrust
washeronpinandsecurewiththeretainingring.
6.Removethecapsandplugsthatwereinstalledtothehydraulichosesand
ttingsduringtheremovalprocess.
7.PutacoatingofcleanhydraulicuidonnewttingO-rings,installtheO-rings,
andconnectthehydraulichosestothettingsontheliftcylinder.Tightenthe
hoseconnections;refertoInstallingtheHydraulicHoseandTube(O-Ring
FaceSealFitting)(page6–11).
8.Iftheliftcylinderforoutsidefrontcuttingunits(#4or#5)wasremoved,
securetheR-clamptotheliftcylinderwiththeangenut(item13inFigure
182)andcarriagescrew.
9.Lubricatetheliftcylindergreasettings.
10.Checkthehydraulic-uidlevelinthehydraulictankandaddcorrectquantity
ofuidifnecessary;refertotheOperator’sManual.
11.Operatethemachinefunctionsslowlyuntilairisoutofsystem;referto
ChargingtheHydraulicSystem(page6–151).
HydraulicSystem:ServiceandRepairs
Page6–218
Reelmaster
®
5410/5510/5610Series
15216SLRevC

Table of Contents

Other manuals for Toro Reelmaster 5510-D

Related product manuals