16
II. Scheduled Watering
•  Start Times
•  Prog ET Toggle
•  Clear Schedule
•  Schedule Length
•  Run Days
•  Program Clear
•  Rain Off  Days
•  Assigned Sched
•  Water Window
•  Continuous Run
•  Repeat Dly (Delay) Time
•  Repeats
•  Percent Scale
•  Slot-Stn-Time
Schedule refers to the days of  the week a program is set to run. Up to 16 unique watering day schedules can be dened in the  
Sentinel Controller. Each schedule has a number assignment from 1 to 16. In the controller display, schedules are indicated by “S” and its two-
digit schedule number (01, 02,… 16). For example, Schedule 12 is shown as “S12.”
Each schedule can be programmed as either a six week schedule or a 365-day calendar. Toro recommends that all schedule  
programming through the faceplate be accomplished using 6-week schedules. Using a 365-day Calendar schedule requires the user to select 
the irrigation status for every day of the year. (All days are default OFF.) 
A schedule may have any combination of watering days and may be assigned to any of  the sixteen programs (covered in the next section, 
Program Setup). You must assign a schedule to a program to activate it. If  using a 6 Week Schedule, the current Schedule Week was set in Time & 
Day as part of  controller setup (example was set to W1). When the controller reaches the end of a six-week schedule (W6), the program loops 
back and starts again with Week 1 (W1).