EasyManua.ls Logo

Toro Z MASTER 2000 Series - Page 39

Toro Z MASTER 2000 Series
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Engine Installation (continued)
2. Using a 9/16 inch socket, install the 4 (3/8 inch) bolts to secure the engine to
the chassis. T orque to 41 ± 4 N•m (30 ± 3 ft-lb).
g420390
Figure 17
For securing, refer to the torque sequence below .
g431 179
Figure 18
3. Install the clutch. Refer to Clutch Installation ( page 4– 18 ) .
4. Install the hydrostatic drive belt. Refer to Hydrostatic Drive Belt Installation
( page 7– 1 1 ) .
5. Install the deck belt. Refer to Deck Belt Installation ( page 5– 9 ) .
6. Using a 1/2 inch socket, install the (5/16 inch) bolt securing the engine ground
to the engine crankcase. For Briggs engines, using a 7/16 inch socket,
install the 1/4 inch bolt securing the engine ground to the engine crankcase.
2000 Series Z MASTER®Service Manual Page 4–1 1
Engine: Service and Repairs
3460-328 Rev A

Table of Contents

Other manuals for Toro Z MASTER 2000 Series

Related product manuals