Operation
Commissioning
47
Operation
Commissioning
Essentially the same procedure is carried out for commissioning and start-up
after maintenance.
The daily commissioning via the control unit of the overall conveyor system
is described in the system documentation or in the control documentation.
The machine is designed for the following electrical connection data:
3 phases, neutral conductor and earthing conductor
Alternating voltage 400 V
Mains frequency 50 Hz.
Initial commissioning and commissioning after
repair
Precondition:
The machine has been appropriately installed.
The working area of the machine is inaccessible to unauthorised
personnel.
The master switch for the power supply to the machine is switched off
and has been secured against unauthorised switch-on.
Machine downtime no longer than 4 weeks.
Check the installa-
tion
Carry out the following work steps:
1. Check the position of all drums and rollers.
2. Check that the drive elements are correctly attached, aligned and
tensioned.
3. Check the machine for foreign objects and remove them if necessary.
Installation has been checked.