3. Before Installing the System
Green 16/18 Installation Manual 33
English
6. Put the Main Unit with the EPS (Main Base) on a Transport Dolly and move it
to the installation site.
When putting the Main Unit on the dolly, make
sure that the center of the mass indicator is
aligned with the center of the dolly.
If you move the unit manually, make sure that the
persons holding the upper handle take the lead.
<Transportation Example>