EasyManua.ls Logo

Vatech Green 16 - Page 57

Vatech Green 16
162 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Installing the Equipment: Base Stand (Optional)
Green 16/18 Installation Manual 49
English
Make sure the CEPH cables from the
equipment go through the CEPH armhole.
4. Tighten the three wrench bolts to attach the base unit.
Allen Wrench 6 mm / 0.24”
Wrench Bolt
M8 x 20 - 3 pcs
(Part No. 25)
Flat Washer (Part No. 34)

Table of Contents

Related product manuals