EasyManua.ls Logo

Vatech Green 16 - Page 81

Vatech Green 16
162 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. Installing the Equipment: Wall Mount
Green 16/18 Installation Manual 73
English
3. Put the Equipment on the aligning plate while making sure that the column bottom
holes engage in the anchored bolts.
4. Put the washers and nuts into the six anchored bolts on the floor and tighten the
nuts loosely. Make sure that you put the fasteners in the sequence, as shown in
the figure.
Do not tighten the nuts until the leveling is completed.
When you are tightening the nuts, another person must
hold the middle handle to prevent the equipment from
falling.

Table of Contents

Related product manuals