3. Before Installing the System
30 Smart Plus (PHT-35LHS) Installation Manual
5. Pull out the Main Unit with the EPS (Main Base) from the pallet.
6. Put the Main Unit with the EPS (Main Base) on a Transport Dolly and move it
to the installation site.
When putting the Main Unit on the dolly, make sure
that the center of the mass indicator is aligned with
the center of the dolly.
If you move the unit manually, make sure that the
persons holding the upper handle take the lead.
<Transportation Example>