95x Series Operating Manual - May 17, 2022
Page 58 of 155
CONFIGURING
An example DCez menu is as follows –
Seq 1 Step 1 DCez
LEVEL: 1500.0V
RAMP: 1.00sec
DWELL: 30.0sec
Lim: 0n-15.00mA
ON FAIL: ABORT SEQ
An example DCW menu is as follows –
Seq 1 Step 1 DCW
LEVEL: 1500.0V
BREAKDOWN: 30.00mApk
RAMP: 1.00sec
DWELL: 30.0sec
Delay: 0.25sec
Lim: 0n-15.00mA
ARC DETECT:4us 10mA
DISCHARGE: AS RAMP
ON FAIL: ABORT SEQ
An example DCIR menu is as follows –
Seq 1 Step 1 DCIR
LEVEL: 1500.0V
BREAKDOWN: 30.00mApk
RAMP: 1.00sec
DWELL: 30.0sec
Delay: 0.25sec
End On: PASS
Lim: 100.0K-no max
ARC DETECT:4us 10mA
DISCHARGE: AS RAMP
ON FAIL: ABORT SEQ
• LEVEL. Allows the test voltage level to be programmed. Note that a value cannot be set which is beyond
the range of possible output voltages from the specific 95x or above the maximum voltage limit set by the
user in the CNFG – TEST – USER MAX DCV setting.
• DUT GROUNDED. Only available if option HSS or HSS-2 is installed. This selection allows the user to
select either –
o NO. This selection indicates that the DUT is isolated from ground, the 95x will use the current in
the RETURN terminal to measure leakage and detect breakdown. This is as if option HSS or HSS-
2 were not installed.
o YES. This selection indicates that the DUT is grounded, the 95x will use the current in the HV
terminal to measure leakage and detect breakdown.
• BREAKDOWN. Not available for the DCez type. Allows breakdown detection to be programmed as a
maximum instantaneous peak current level. Pressing the LIMIT key while this setting is selected causes it
to be set to the maximum value. See Breakdown Current for further details regarding breakdown
currents.
o The minimum value which can be set is 1uA.