49
OPERATING MANUAL
VERSION 05/2017 ORDER NUMBER DOC 2357061
Pre-cleaning
Before the product hoses are connected to the system, they should be ushed, together
with the corresponding pumps, with the ushing agent to be used.
Unless this preliminary ushing is executed, the ow meters can already be clogged
due to contamination during the rst ow through!
For preliminary cleaning of the pumps, carefully follow the corresponding pump
instructions.
After all pumps and product hoses to the device have been ushed, the product hoses
can be connected to the system.
The ushing agent still remains in the pumps.
Note:
The ushing agent used for the rst cleaning may not be used again since it might contain
oil residues.
6.6.2 INITIALIZING THE CONTROLLER
The controller is already individually pre-congured upon delivery. Additional settings
must be entered on-site.
Switch on the system with the main switch.
The initialization programs starts when the system is switched on for the very rst
time. It allows quick input of the most important settings, which must still be entered.
The initialization program can also be called up later (with password level 3, setting
"Reset initialization").
Dene one after the other on the operating panel:
− Language (touch desired language, then proceed with the arrow key
);
− Volumes measuring unit (liters or US gallons, touch eld to change);
− Lengths measuring unit (meter or inch);
− Hose lengths and diameters;
− Number of paint recipes (maximum 100) and number of ushing recipes
(maximum 10);
− Mixing ratio input type (A:B or percentage).
At the end, a note appears, explaining what should be done next. Perform one after
the other (password level 1):
−
Enter names of valves, ushing recipes and paint recipes (see Chapter 7.9.2);
−
Enter ushing recipes (see Chapter 7.10);
−
Enter paint recipes (see Chapter 7.11), still without calibration.
If necessary, implement further settings.