252576780000/00/02-2018
Conguration
Conguration
Applying the supply voltage
To congure the Energy Meter 610/610-PB, the supply voltage
must be connected.
The level of supply voltage for the Energy Meter 610/610-PB can
be found on the nameplate.
If no display appears, check the operating voltage to determine
whether it is within the rated voltage range.
Current and voltage transformers
A current transformer is set to 5/5 A in the factory. The pre-pro-
grammed voltage transformer ratio only needs to be changed if
voltage transformers are connected.
When connecting voltage transformers, the measurement voltage
on the Energy Meter 610/610-PB nameplate must be observed!
Attention!
Supply voltages that do not correspond to the name-
plate information can lead to device malfunction or
destruction.
The adjustable value 0 for the primary current trans-
former does not produce any useful energy values and
must not be used.
Devices, which are programmed to automatic fre-
quency detection, need approximately 20 seconds to
detect grid frequency. During this period, the measured
values do not keep the conrmed measuring accuracy.
Prior to commissioning potential production dependant
contents of the energy counter, min/max values and
records have to be deleted.
Current and voltage transformers
The transformer ratios for each of the three current
and voltage measurement inputs can be individually
programmed in the ecoExplorer go software. Only the
transformer ratio of the respective group of current
measurement inputs or voltage measurement inputs is
adjustable on the device.
Fig.: Display for conguring the current and voltage transformers
in the ecoExplorer go software.