Maintenance03801/A1
RT-flex58T-D
Winterthur Gas & Diesel Ltd.
6/ 8
Group Component Work to be carried out Intervals
67081 Water separator Check condensate collector through sight glass
(see Operating Manual 83451)
daily
Check condensate collector for free passage
(see Operating Manual 83451)
15003000 Op. h
Check water separator elements (if necessary
clean them)
15003000 Op. h
Remove water separator for general overhaul as required
7
72181 Lubricating pump
and accumulator
(Pulse lubrication)
General maintenance works according to instructions
of equipment
manufacturer
Checking gas (nitrogen) pre-charge pressure:
CLU4C min. 30 bar / max. 35 bar
directly after installation of a new accumulator >
then at least once in first week after start-up >
afterwards >
every three months
8
81351
Exhaust Waste
Gate (LLT)
During a longer operation period at low engine
load, manually open butterfly valve at least once
per week (see Operating Manual 81351)
General inspection
according to instruction
of valve manufacturer
Servo oil
automatic filter
Follow manufacturer’s instructions
Starting air
piping
Drain (de-water) before and after every
manoeuvering period
Pressure gauges
and pyrometers
Compare and calibrate according to master
instruments
60008000 Op.h
Fuel and
lubricating oil
filters
Clean or replace filter elements
(depending on make, follow manufacturer’s in-
structions)
as required
Pipe holders Check fastenings periodically, if necessary
retighten screws
(first time after 100 Op.h, then half yearly)
as required
84471 HP servo oil pipe Regrind sealing faces as required
84601 Hydraulic pipe for
exhaust valve
drive
Regrind sealing faces as required
2013 / V2
Inspection and Overhaul Intervals (Guidelines)