Maintenance
1112−1/A1
RT-flex58T-D
Winterthur Gas & Diesel Ltd.
1/ 3
Tools: Key to Illustrations:
1 Feeler gauge 94122 1 Bedplate 11 Control pin
1 Pre-tensioning jack 94145 2 Foundation bolt 12 Vent screw
1 HP oil pump 94931 3 Foundation bolt 13 Cylinder
1 Hydr. distributor 94932 4 Foundation fitted stud 14 Piston
1 Hydr. distributor 94934A 5 Sleeve
1 Plug piece 94934E 6 Nut
1 HP hose 94935 7 Nut EV Relief valve
1 HP hose 94935A 8 Conical socket KO Slot
9 Chock RS Round bar
10 Ship’s foundation plate SA Gap
1. General
The pre-tension of the foundation bolts (holding down studs) must be checked at
longer intervals e.g. during overhauls (see 0380−1).
In the area of the thrust bearing the foundation may be fastened with foundation
bolts 2 and sleeves 5 (Fig. ’A’) or with foundation fitted studs 4 (Fig. ’B’).
The remaining area is fastened with foundation bolts 3, however without sleeves 5
(Fig. ’C’).
Remark: Pay attention to the General Application Instructions 9403−4 for the hy-
draulic pre-tensioning jacks.
5
8
7
A B C
006.131/99
10
6
2
1
9
34
Bedplate and Thrust Bearing
Checking the Foundation Bolts
2013