Installation checklist of the drive
Contents of this chapter
This chapter contains a checklist of the mechanical and electrical installation of the drive.
Checklist
Examine the mechanical and electrical installation of the drive before start-up. Go through
the checklist together with another person.
WARNING!
Obey the safety instructions of the drive. If you ignore them, injury or death, or
damage to the equipment can occur.
If you are not a qualified electrical professional, do not do installation or
maintenance work.
WARNING!
Stop the drive and do the steps in section Electrical safety precautions (page 14)
before you start the work.
Make sure that …
The ambient operating conditions meet the drive ambient conditions specification, and enclosure rating
(IP code or UL enclosure type).
The supply voltage matches the nominal input voltage of the drive. See the type designation label.
The drive is attached securely on an even, vertical and non-flammable wall.
The cooling air flows freely in and out of the drive.
If the drive is connected to a network other than a symmetrically grounded TN-S system: You have
done all the required modifications (for example, you may need to disconnect the EMC filter or ground-
to-phase varistor). See the electrical installation instructions.
8
Installation checklist of the drive 87