EasyManua.ls Logo

ABB ACS5000 - Page 14

ABB ACS5000
186 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 3-20 EXU control panel 58
Figure 3-21 Location of protection features and lights 59
Figure 3-22 Grounding switch 60
Figure 3-23 Locking bar and white lamp 61
Figure 3-24 Grounding stud 62
Figure 3-25 4-way grounding set 62
Figure 3-26 Connection studs for the 4-way grounding set in
the COU 63
Figure 3-27 Connection studs for the 4-way grounding set in
a PCU 64
Figure 4-1 Lifting bracket on base frame of a drive and
safety hook secured to lifting bracket 68
Figure 4-2 Lift frame and lift spreader 69
Figure 5-1 Floor inclination 75
Figure 5-2 Connection points on side of transport units (PCU
example) 77
Figure 5-3 Applying silicone 78
Figure 5-4 Roof joint 78
Figure 5-5 Lifting a cooling unit (example with IP54 unit) 79
Figure 5-6 Cable duct openings (example with 1700 mm PCU) 81
Figure 5-7 Water inlet / outlet and drain outlet (back view) 83
Figure 5-8 Roof attachment 84
Figure 5-9 Recommended ceiling and wall fixings 85
Figure 5-10 Busbar connections 87
Figure 5-11 AC busbar connection 88
Figure 5-12 PE ground busbar connection 88
Figure 5-13 DC busbar connection 88
Figure 5-14 Heating cable connection 89
Figure 6-1 Grounding the transformer and the drive (in PCU) 93

Table of Contents

Related product manuals