4 Maintenance
4.1 Maintenance schedule, OmniCore
General
The controller must be maintained at regular intervals to ensure its function. The
activities and intervals are described in this section.
Activities and intervals
Detailed in section:IntervalMaintenance
activity
Equipment
Inspecting the OmniCore E10 con-
troller on page 106
12 months
i
InspectionComplete controller
Inspecting the OmniCore E10 con-
troller on page 106
6 months
i
InspectionSystem fans
Cleaning of the controller cabinet
on page 107
CleaningControl cabinet
Cleaning the FlexPendant on
page 108
When neededCleaningFlexPendant
Function test of emergency stop on
page 110
12 monthsFunction testEmergency stop
(FlexPendant)
Function test of manual, auto, and
manual full speed mode with Flex-
Pendant on page 111
12 monthsFunction testManual, auto and
manual full speed
mode with FlexPend-
ant
Function test of three-position en-
abling device on page 112
12 monthsFunction testEnable device
Function test of safety switches on
page 113
12 monthsFunction testSafety switches
Function test of Automatic Stop on
page 114
12 monthsFunction testAuto stop (tested if
used)
Function test of General Stop on
page 115
12 monthsFunction testGeneral stop (tested
if used)
Function test of external emergency
stop on page 116
12 monthsFunction testExternal emergency
stop (tested if used)
Function test of ESTOP_STATUS
output on page 117
12 monthsFunction testESTOP_STATUS
output (tested if
used)
Function test of reduced speed
control on page 118.
During commis-
sioning
Function testReduced speed
control
i
The interval depends on the working environment of the equipment: a cleaner environment may
extend the maintenance interval and vice versa.
Function test after replacement of component
After replacing a component in the controller, the function tests should be
performed. See Function tests on page 110.
Product manual - OmniCore E10 105
3HAC079399-001 Revision: C
© Copyright 2019-2022 ABB. All rights reserved.
4 Maintenance
4.1 Maintenance schedule, OmniCore