EasyManua.ls Logo

ABB REACT 2 Series - Installation

ABB REACT 2 Series
159 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 57 -
000021FG
General conditions
The device is installed depending on the system and the place where the device is installed.
Its performance therefore depends on the correctness of the connections.
Staff authorised to carry out the installation must be specialised and
experienced in this job. They must also have received suitable training
on equipment of this type.
7KHRSHUDWLRQPXVWEHFDUULHGRXWE\TXDOL¿HGSHUVRQQHODQGLWLVDGYLVDEOH
to adhere to the indications provided in this manual, the diagrams and
the enclosed documentation.
)RUVDIHW\UHDVRQVRQO\DTXDOL¿HGHOHFWULFLDQZKRKDVUHFHLYHGWUDLQLQJDQGRUGHPRQVWUD-
ted skills and knowledge on the structure and operation of the unit may install the inverter.
7KHLQVWDOODWLRQPXVWEHSHUIRUPHGE\TXDOL¿HGLQVWDOOHUVDQGRUOLFHQVHGHOHFWULFLDQVLQDF-
cordance with the existing regulations in the country of installation.
The removal of the inverter panels/covers allows access to the area dedicated to service
personnel (the operator is not authorized to access this area)
Connection of the photovoltaic system to an electric installation connected to the distribution
grid must be approved by the electricity provider.
The installation must be carried out with the equipment disconnected from the grid (power
disconnect switch open) and with the photovoltaic panels shaded or isolated.
When the photovoltaic panels are exposed to sunlight they provide continuous DC voltage
to the inverter.
5
Installation

Table of Contents

Related product manuals