5 - Installation
5HPRYH WKH SURWHFWLYH FRYHU
from the connector of the Wi-
Fi antenna
22
located on the
lower part of the REACT2-UNO
02
and install the Wi-Fi antenna
(supplied inside the REACT2-
UNO box) by screwing it into the
VSHFL¿FFRQQHFWRU
0DNH WKH HOHFWULF FRQQHFWLRQV
using personal protective
clothing and/or equipment, such
as insulating gloves.
3URFHHG ZLWK LQVWDOODWLRQ RI WKH
ABB energy meter.
22
22
5HPRYHWKHFDSVIURPWKHEDWWHU\
connectors:
- To remove the battery signal
connectors
08
simply pull it.
- To remove the battery power
connectors
09
press the latch
(
highlighted in red) and pull it off.
&RQQHFW WKH WZR EDWWHU\ FDEOHV
between inverter and battery unit
(supplied inside the REACT2-BATT
box).
Give each cable a pull test to
FRQ¿UPWKHFRQQHFWLRQLVVHFXUH
DC SWITCH
COM.
+
/
-
COMM.
[B
]
POWER
[B
]
COMM.
[A
]
POWER
[A
]
08
09
09
08
Click
Click
COMM.
[B]
POWER
[B]
COMM.
[A]
POWER
[A]
Click
Click