ABB Relion REC670 - 16.5 Event function EVENT; 16.6 Disturbance report DRPRDRE

ABB Relion REC670
482 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
220kV Busbar
300/1
15 / 0,1kV
4000/5
100 MVA
242/15,65 kV
Yd5
U
L1L2
, U
L2L3
G
P Q
100MVA
15,65kV
IEC09000041-1-en.vsd
IED
IEC09000041-1-EN V1 EN-US
Figure 189: Single line diagram for generator application
In order to measure the active and reactive power as indicated in figure 189, it is necessary to
do the following:
1. Set correctly all CT and VT data and phase angle reference channel
PhaseAngleRef
(see
section "") using PCM600 for analog input channels
2. Connect, in PCM600, measurement function to the generator CT & VT inputs
3. Set the setting parameters for relevant Measurement function as shown in the following
table:
Section 16 1MRK 511 358-UEN A
Monitoring
384
Application manual