EasyManuals Logo

ABB RET670 Installation And Commissioning Manual

ABB RET670
240 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #83 background imageLoading...
Page #83 background image
Section 7 Energizing the IED
About this chapter
This chapter describes the start-up sequence and what to check once the IED has
been energized.
7.1
Check the IED operation
Check all connections to external circuitry to ensure that the installation was made
correctly, before energizing the IED and carrying out the commissioning procedures.
The user could also check the software version, the IED's serial number and the
installed modules and their ordering number to ensure that the IED is according to
delivery and ordering specifications.
Energize the power supply of the IED to start it up. This could be done in number
of ways, from energizing a whole cubicle to energizing a single IED. The user
should re-configure the IED to activate the hardware modules in order to enable the
self supervision function to detect possible hardware errors. The IED time must be
set. The self-supervision function in the Main menu/Diagnostics/Monitoring
menu in local HMI should also be checked to verify that the IED operates properly.
7.2 Energizing the IED
When the IED is energized, the green LED instantly starts flashing. After
approximately 55 seconds the window lights up and the window displays ‘IED
Startup’. The main menu is displayed and the upper row should indicate ‘Ready’
after about 90 seconds. A steady green light indicates a successful startup.
1MRK 504 088-UEN C Section 7
Energizing the IED
77
Installation and commissioning manual

Table of Contents

Other manuals for ABB RET670

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB RET670 and is the answer not in the manual?

ABB RET670 Specifications

General IconGeneral
Rated Frequency50/60 Hz
InputsAnalog and binary inputs
ApplicationProtection of power systems
Communication ProtocolsIEC 61850, DNP3, Modbus
Operating Temperature Range-25°C to +55°C
MountingRack mounted
Number of Binary InputsUp to 48
Number of Binary Outputs32
Protection FunctionsOvercurrent Protection
OutputsBinary outputs
EnclosureIP 54
TypeLine Differential Protection
Number of Analog Inputs24

Related product manuals