Commissioning
System Manual
67
6.2.2 Physical addresses ― Preparing addressing
If the devices have a display, the addressing is carried out on the device itself.
If the devices do not have a display, the addressing is carried out via the IP Touch 7.
Devices with display
As soon as the devices are supplied with voltage via the PoE switch, the device boots up
automatically.
The devices are prepared for addressing.
Devices without display
Connect the devices to the indoor station via a PoE switch.
As soon as the devices are supplied with voltage via the PoE switch, the device boots
up automatically.
The devices are prepared for addressing.