AcuRev 1300
Before Installtion
The installation must be perfomred by qualified, competent accredited professionals
who have received formal training and have experience with high voltage and current
devices. Appropriate safety wear (gloves, glasses, arc flush suit, etc.) is mandatory to
ensure safe installation.
During normal meter operation, caution should be used when handling the following
as high voltage may be present: Terminal Blocks, Current Transformer connection
nodes, Potential Transformer connection nodes and the related circuits. All primary and
secondary circuits may contain lethal current and voltage. Contact with current channels
must be avoided.
The power meter and I/O modules cannot be installed on the primary side of
transformers or where VA has limitations. The power meter can be only installed on the
secondary side. Avoid contact with meter terminals after the completion of installtion.
Do not input voltage above the rated maximum limit of the power meter and devices
connected to it. Before energizing the meter, please refer to the meter's label and
specications.
Do not perform high voltage test / insulation experiment to output, input or
communication terminals.
The use of shorting blocks and fuses are recommended. Current transformers need to
be grounded.
Use dry cloth to wipe the meter.
The replace of the Battery must be performed by professionals.