9
AcuRev 1300
2. Humidity
5% to 95% non-condensing.
3. Location
AcuRev1300 series meter should be installed in a dry and dust free environment.
Avoidexposing meter to excessive heat, radiation and high electrical noise sources.
Installation Steps:
This product is DIN railed mounted and ts on the standard 35mm rail.
1. To install the meter on the rail insert the top of the rail into the groove on the back
of the meter.Pull the metal clips back and slide the rail across the groove of the meter.
Figure 2-3 Step A
2. Use the metal clips to tighten the rail to complete installation.
Installation Rail

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the AccuEnergy AcuRev 1300 and is the answer not in the manual?

AccuEnergy AcuRev 1300 Specifications

General IconGeneral
BrandAccuEnergy
ModelAcuRev 1300
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals