EasyManua.ls Logo

Acteon X-MIND unity - Diagnostic; X Ray Calibration Procedure

Acteon X-MIND unity
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
 !"##"$"%"&%*""# 
XM_unity_Installation&Maintenance_Manual Ed.1.3c2013 Page BCof (()
((4 
((4(4 

$*''(
,"#*6
(
Here below these instructions will explain how to perform Xray tube calibration procedure.
1. Press and keep pressed key mA for 5 seconds until message “TUBE CALIBRATION” appears on the display
2. Take a safety position far from the xray beam, press and keep pressed the exposure key . On the display will appear
“CAL. IN PROGRESS” message, Exp. Led is lit and an intermittent acoustic sound is emitted.
3. At the end of the procedure, acoustic sound stops and on the display appears “CAL. SUCCESS” message.
4. After waiting the pause time (it will be longer than the normal rest time), the timer back to standard functioning and it is
ready for a new exam.

*)*L@
+$'& *)*$
***

Table of Contents

Other manuals for Acteon X-MIND unity

Related product manuals