EasyManua.ls Logo

ADS TRITON+ - Page 402

ADS TRITON+
535 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11-4 ADS TRITON+ Manual
z Make sure all connector ports on the monitor top are dry. Use
compressed air or paper towels to dry out wet or damp
connectors. Note and replace missing interfacial seals in the
sensor connector ends. The connectors can be protected
against moisture by wrapping with self-vulcanizing rubber
stretch tape. Make sure covers are securely in place on any
unused ports on the monitor top.
Confirming the Monitor
Confirm the accuracy of the sensor subsystems in the monitor on a
regular basis through Qstart
XML
. Confirmation involves comparing
manually measured depth of flow and velocity readings to the
monitor's readings. This process also verifies sensor parameters.
Refer to the Qstart
XML
online help for detailed information on
performing confirmation procedures.
Obtaining (Uploading) the Monitor Hardware
Configuration
Uploading the monitor’s hardware configuration parameters can
assist in monitor troubleshooting. The uploaded information
displays the IMEI number, firmware version, and details on the
sensor hardware connected to the monitor and the channels to
which they are connected.
Use Qstart
XML
to upload the monitor hardware configuration by
performing the following:
1. Open Qstart
XML
and select the monitor from the Location
Name drop-down list.
2. Select the Connect button to establish communications with
the monitor.
3. Select the Advanced button in the Functions section.
4. Select the Upload button in the Configuration section to
upload the hardware configuration parameters from the
monitor.
5. Print the log while online or hang up and access the saved log
in the Qstart
XML
Logs (Configuration type logs).

Table of Contents

Related product manuals