Benchmark 1500 - 2000 Boilers
CHAPTER 9. BOILER SEQUENCING TECHNOLOGY
OMM-0097_0E AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 Page 117 of 182
GF-142 Ph.: 800-526-0288 10/01/2015
9.2 AERCO BST Quick Start Chart
Select the single option that suites your installation and then complete the instructions in the
corresponding sub-sections of section 9.3 BST Implementation Instructions.
Constant Setpoint (choose option 1 or 2)
Option 1 – Direct Wired Header
Complete section 9.3.1
OR
Option 2 – Modbus Header
Complete section 9.3.2
Outdoor Reset (choose option 3 or 4)
Option 3 – Direct Wired Header AND Direct Wired
Outdoor Air
Complete section 9.3.3
OR
Option 4 – Modbus Header AND Modbus Outdoor Air
Complete section 9.3.4
Remote Setpoint (choose option 5 through 8)
Option 5 – 4-20ma Drive AND Direct Wired Header
Complete section 9.3.5
OR
Option 6 – Modbus Drive AND Direct Wired Header
Complete section 9.3.6
OR
Option 7 – 4-20ma Drive AND Modbus Header
Complete section 9.3.7
OR
Option 8 – Modbus Drive AND Modbus Header
Complete section 9.3.8