AfiMilk MPC Installation Manual
45
Laying Cables and Connecting Wires
Chapter
6
To insert a cable into the connection box:
7. Using pliers, pull a plug out of the desired grommets per size of cable as explained
above. Being the widest cable in use, Afimilk MPC main cable has a single grommet
option (see figure below).
8. Loosen the grommet nut
9. Insert the cable through the grommet hole
10. Connect the wires of the cable to the appropriate terminal blocks as described below.
11. Pull excessive slack of cable back through the inlet.
12. When all the wiring of the cables inserted through the grommet is done, tighten the nut
by hand until cables may no longer be pulled out.
Figure 11: Afimilk MPC Connection Box Grommets
Connecting Wires to the Afimilk MPC Control Box
After running cables pier to pier, wires are connected to Afimilk MPC control box via
Afimilk MPC main cable. The diagram below and table in the following page illustrate
electronic connections of Afimilk MPC milk meter system.
Insert Afimilk
MPC Main cable
through here