EasyManuals Logo

Agilent Technologies 55B AA User Manual

Agilent Technologies 55B AA
154 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #92 background imageLoading...
Page #92 background image
Maintenance
92 Agilent 55B AA Spectrometer User’s Guide
Weekly
Check for O-ring deterioration.
Clean the lamp and sample compartment windows.
Check the air filter, spray chamber and liquid trap.
Yearly
Arrange for Agilent trained and certified personnel to perform preventative
maintenance.
Maintenance schedule nebulizer/spray chamber
Daily
Clean the nebulizer/spray chamber assembly thoroughly at the end of
every working day by aspirating at least 50 mL of the appropriate solvent
through the system.
Test all connections for leaks with a brush and soap solution or a
proprietary leak-detecting solution. Never use a naked flame when testing
for leaks. Rectify all leaks before lighting the flame.
Test the nebulizer for leaks. If any leakage is detected, replace the internal
O-rings.
Monthly
Remove and check the nebulizer, re-install the nebulizer (outlined in the
following section) and measure the uptake rate to verify the Performance
checks– see Page 85.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 55B AA and is the answer not in the manual?

Agilent Technologies 55B AA Specifications

General IconGeneral
BrandAgilent Technologies
Model55B AA
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals