EasyManuals Logo
Home>Agilent Technologies>Laboratory Equipment>5975 Series

Agilent Technologies 5975 Series Hardware Installation

Agilent Technologies 5975 Series
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #22 background imageLoading...
Page #22 background image
22 Hardware Installation
2 Installation
Overview
Installing the MSD system includes the following steps:
Unpacking and inspecting shipped materials
Installing the GC
Installing the MSD
Installing the computer and peripherals
Integrating the GC and MSD
Evaluating performance
Familiarizing the customer with the system
Installing CI MSD systems requires additional steps:
PFDTD calibrant added to calibration vial
Methane/isobutane gas purifier installation
Methane reagent gas line and gas purifier purge
Methane reagent gas line hookup
After system performance has been verified in EI mode, the MSD must be
switched to CI mode and evaluated:
Chemical ionization (CI) ion source and CI interface tip seal installation
Bakeout and purge at least 2 hours
CI setup
Positive chemical ionization (PCI) autotune and sensitivity verification
Negative chemical ionization (NCI) autotune and sensitivity verification
High-mass autotune and sensitivity verification
The G3397A High Vacuum Gauge controller is required for CI operation.

Table of Contents

Other manuals for Agilent Technologies 5975 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 5975 Series and is the answer not in the manual?

Agilent Technologies 5975 Series Specifications

General IconGeneral
BrandAgilent Technologies
Model5975 Series
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals