50 Hardware Installation
3 Checklists
❒ Foreline pump stops gurgling within 60 seconds verified
❒ MSD turned off after 10 minutes of pumping down
❒ GC heated zones turned off
❒ GC carrier gas flow set to 1.0 mL/min with constant flow enabled
MSD ChemStation PC installation
❒ PC, monitor, and printer unpacked
❒ PC installed
❒ Network switch unpacked and plugged in
❒ LAN cable from the MSD connected to switch Port #1
❒ LAN cable from the GC connected to switch Port #2
❒ LAN cable from the PC connected to switch Port #3
❒ Printer installed
❒ Printer, monitor, and PC turned on (in that order)
❒ Software installed per the software installation manual
Performance verification
EI system verification
❒ Pumpdown for at least 60 minutes
❒ GC oven set to 150 °C and the column flow to 1.0 mL/min
❒ Checkout Tune performed
❒ Tune Verification performed
❒ Sensitivity Check verification of EI Sensitivity performance