50 Hardware Installation
3 Checklists
Foreline pump stops gurgling within 60 seconds verified
MSD turned off after 10 minutes of pumping down
GC heated zones turned off
GC carrier gas flow set to 1.0 mL/min with constant flow enabled
MSD ChemStation PC installation
PC, monitor, and printer unpacked
PC installed
Network switch unpacked and plugged in
LAN cable from the MSD connected to switch Port #1
LAN cable from the GC connected to switch Port #2
LAN cable from the PC connected to switch Port #3
Printer installed
Printer, monitor, and PC turned on (in that order)
Software installed per the software installation manual
Performance verification
EI system verification
Pumpdown for at least 60 minutes
GC oven set to 150 °C and the column flow to 1.0 mL/min
Checkout Tune performed
Tune Verification performed
Sensitivity Check verification of EI Sensitivity performance

Table of Contents

Other manuals for Agilent Technologies 5975 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 5975 Series and is the answer not in the manual?

Agilent Technologies 5975 Series Specifications

General IconGeneral
BrandAgilent Technologies
Model5975 Series
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals