46 Hardware Installation
3 Checklists
Installation Checklist
Verifying that site preparation is complete
❒ Adequate space is available for the MSD system.
❒ Suitable supporting bench.
❒ Adequate electrical power is available at the correct voltages and
frequencies.
❒ Environmental control systems are adequate to maintain a correct, stable
operating environment.
❒ Safe exhaust venting preparations are adequate.
❒ Supplies necessary for instrument operation are available, including
solvents, carrier and reagent gasses, and printer paper.
❒ Conveniently located telephone.
Unpacking and inspecting the shipped materials
❒ Shipping containers must be opened only with an Agilent Technologies
representative present to verify the contents of each container.
❒ Check each item off on the packing list and verify serial numbers.
❒ Record the serial numbers in the installation documentation.
❒ Retain shipping containers and material until contents are checked for
completeness and instrument performance is verified.
❒ Notify the distribution center of any missing or damaged items.