EasyManuals Logo
Home>Agilent Technologies>Laboratory Equipment>5975 Series

Agilent Technologies 5975 Series Hardware Installation

Agilent Technologies 5975 Series
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #39 background imageLoading...
Page #39 background image
Installation 2
Hardware Installation 39
Verifying EI System Performance
Material needed:
1 pg/µL (0.001 ppm) OFN sample (5188-5348)
Verify the tune performance
1 Verify that the system has been pumping down for at least 60 minutes.
2 Set the GC oven temperature to 150°C, and the column flow to 1.0 mL/min.
3 In the Instrument Control view, select Checkout Tune from the Checkout menu.
The software will perform an autotune and print out the report.
4 When the autotune has completed, save the method, and then select
Evaluation Tune from the Checkout menu.
The software will evaluate the last autotune and print a System Verification
– Tune report.
Verify the sensitivity performance
1 Set up to inject 1 µL of OFN, either with the ALS or manually.
2 In the Instrument Control view, select Sensitivity Check from the Checkout menu.
3 Click the appropriate icons in the Instrument Edit window to edit the method
for the type of injection.
4 Click OK to run the method.
5 When the method is completed, an evaluation report will print out.
Verify that rms signal-to-noise ratio meets the published specification. See
Agilent publication 5988-9991EN.

Table of Contents

Other manuals for Agilent Technologies 5975 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 5975 Series and is the answer not in the manual?

Agilent Technologies 5975 Series Specifications

General IconGeneral
BrandAgilent Technologies
Model5975 Series
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals