EasyManuals Logo
Home>Agilent Technologies>Laboratory Equipment>8860

Agilent Technologies 8860 Installation And First Startup

Agilent Technologies 8860
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #29 background imageLoading...
Page #29 background image
1 Installing the GC
Installation and First Startup 29
3 Install the regulator onto the compressed gas cylinder main fitting.
Check the thread type. Some regulators use left-hand thread fittings. For left-handed
threads, the nut will have a groove in it.
4 Purge the air from the regulator by repeating the following procedure 5 times:
a Fully close the regulator knob, then open the main tank valve.
b Turn the regulator knob fully counter-clockwise to open the tank main valve,
pressurizing the primary side of the regulator.
c Turn OFF the tank main valve.
d Slowly turn the regulator knob clockwise to release (“bleed off”) the gas pressure.
e Close the regulator knob.
The image below illustrates a typical pressure regulator installation. In the example shown
below, which uses an optional shutoff valve, open the shutoff valve and leave open during
purging.
Groove indicates
left-hand thread

Table of Contents

Other manuals for Agilent Technologies 8860

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 8860 and is the answer not in the manual?

Agilent Technologies 8860 Specifications

General IconGeneral
BrandAgilent Technologies
Model8860
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals