1 Installing the GC
48 Installation and First Startup
Step 16 Configure the checkout column
You must configure the consumable items (such as the checkout column).
Checkout column
The column length, inside diameter, and film thickness are on a metal tag attached to the
column.
1 Select Method > Configuration > Columns.
2 Double-click or double-tap in the column row (or in the next empty row). When prompted,
enter the column details, such as dimensions, type, temperatures, and so on. Select OK to
accept the entries.
3 Use the drop-down lists to select the column's Inlet, Outlet, and Heated By values. (See the
descriptions below.)
This completes configuration for a single capillary column. Also see the Operation manual for
more information about configuring columns.