Installation and First Startup 3
Contents
1 Installing the GC
Overview of Installation 8
Purpose of this procedure 8
Customer responsibilities 8
About Agilent’s installation service 8
Tools and additional parts required 8
Performing checkout 9
System installation 9
Configuring the GC 9
Connecting to the Browser Interface 10
The 8860 GC 11
Unpacking 12
Place the GC on the bench 13
Verify line voltage, voltage settings, and power cord 15
Line voltage 15
Power consumption 16
Power cords available 17
Grounding 21
Connect GC to LAN, Local Computer, or Tablet 22
Connect the power cord and turn on the GC 24
Configure the GC IP address 25
Set the Pressure Units 26
Configure Carrier Gas Types 27
Connect Gases and Traps 28
Install the gas regulators 28
Connect the tubing to the gas source 30
Install traps 31
Plumb to EPC flow modules 31
Install Aux EPC module frits for your application 32
Install hydrogen sensor calibration gas 34
Leak test all connections and set source pressures 36
Set source gas pressures 38
Install inlet checkout parts 39
Install ALS, if ordered 40