1 Installing the GC
Installation and First Startup 51
Step 19 When the system stabilizes, run one
injection
Perform the checkout procedure as described in the Operation Manual.
1 Enter the parameters for the checkout procedure.
• If using an Agilent data system, use it to create a checkout method.
• If not using a data system, enter the setpoints using the Browser Interface.
2 When the GC is ready to begin a run, the Touchscreen status shows STATUS: NORMAL
READY (alternately, when the component of the GC is not ready to begin a run, the
touchscreen shows STATUS: NOT READY), make the injection and start the run.
For a manual injection, inject the sample and press Prep Run .
3 Evaluate results by comparing the chromatogram you generated with the one in the
checkout procedure. There should be a close resemblance.