EasyManua.ls Logo

Allen-Bradley GuardLogix 5570

Allen-Bradley GuardLogix 5570
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
98 Rockwell Automation Publication 1756-UM022D-EN-P - May 2017
Chapter 5 Add, Configure, Monitor, and Replace CIP Safety I/O Devices
6. Verify that the (NS) network status indicator is flashing on the correct
module and click OK to set the SNN on that device.
RSNetWorx for DeviceNet software confirms that the SNN has been
set.
Once the download is completes successfully, the main project view
displays this message: ā€˜The device at address xx has been downloaded.
Any device-specific messages related to the download operation are
displayed separately.’
Assuming this is the proper configuration from the original DNT file,
the SNN and configuration signature now match that of the original. If
you are already connected to the controller, a connection is made. The
controller does not need to be taken out of Run mode to download to
the replacement module.
If you download this configuration to a temporary setup, place the
module on the network and it automatically connects to the controller.

Table of Contents

Other manuals for Allen-Bradley GuardLogix 5570

Related product manuals