EasyManuals Logo

Ametek Thermox WDG-VC User Manual

Ametek Thermox WDG-VC
164 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #38 background imageLoading...
Page #38 background image
2-16 | Thermox WDG-V / VC / VCM with Blow Back
Start-Up Checklist
Review the installation chapter in the User’s Manual.
Install the sensor on the process.
- If the sensor is on the pipe nipple, insulate the pipe from the process
wall to the mounting flange on the sensor.
- Install the probe.
- Install the probe heater, if required.
This type of sensor requires a clean, dry instrument air supply for the
aspirator. Connect the air supply to the aspirator air supply inlet but
DO NOT turn on the air until the sensor is at operating temperature.
If the analyzer is turned off or the process is shut down, the aspirator
air should be turned off to avoid plugging problems.
If used, interconnect the AMEVision Display User Interface and the
sensor per the appropriate interconnecting drawing.
- The specified cable must be used in order to ensure proper operation
of the systems.
Connect AC mains supply to the sensor. Make sure that the AC voltage
is within specified limits.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ametek Thermox WDG-VC and is the answer not in the manual?

Ametek Thermox WDG-VC Specifications

General IconGeneral
BrandAmetek
ModelThermox WDG-VC
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals