Service and Parts | 6-1
SERVICE AND PARTS
The operations in this appendix should be performed only by qualified
service personnel with a knowledge of electrical safety techniques.
Never service the sensor unless power has been removed from the sen-
sor, and the sensor has been allowed to cool for one hour.
This chapter is divided into the following sections:
Cell Replacement
Thermocouple Replacement
Furnace Replacement
Combustibles/Methane Detector Replacement (optional)
Flow Sensor Replacement
Box Heater Wiring
RCU (Remote Calibration Unit) Solenoid Valve Replacement
Electronics Board
Recommended Maintenance Schedule
Replacement Parts List
You can clean the outside of the sensor using normal household or com-
mercial general purpose cleaners, cloths, or sponges. You can also use
water. Always turn off power before attempting to clean the enclosure.
A wiring diagram for a standard sensor is provided in Figure 8-1. This
figure shows the locations of all wiring connections on the sensor. If your
sensor requires different wiring, this is provided in an appendix.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ametek Thermox WDG-VC and is the answer not in the manual?

Ametek Thermox WDG-VC Specifications

General IconGeneral
BrandAmetek
ModelThermox WDG-VC
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals