EasyManua.ls Logo

Animo OptiBean - Page 74

Animo OptiBean
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
74
OptiBean /OptiBean XL
2015/09 Rev. 1.2
4. Remove the back and connect the suction tube to
the tee of the ow meter (remove plug).
Descaling
Place suction tube
in descaler solution
Press enter (v)
5.
The rst acid solution (approx. 1 litre) is pumped into the
boiler and heated. A soaking period of 300 sec. follows*.
Descaling Descaling
Pumping solution
through system
Moment please
boiler temperature
is increased (...C)
Descaling
Moment please
Soaking: 300 sec.
6. Then for 12 seconds the second acid solution
(approx. 1 litre)
is pumped through each of the
dispensing valves. The fresh acid solution is now
heated in the boiler again and a soaking period of
600 seconds follows*.
Descaling Descaling
Pumping solution
through system
Moment please
boiler temperature
is increased (...C)
Descaling
Moment please
Soaking: 600 sec.
* soaking periods can be skipped by pressing the
x-button.
2 Ltr.
2 Ltr.

Table of Contents

Other manuals for Animo OptiBean

Related product manuals