- 52 -
Measure alternator windings insulation resistance (11) xx
Test Earth Leakage breaker (13) x
Check alternator and cubicle electrical system and cables for wear xx
Check alternator cable connections on terminals (12) xx
Check Alternator vibration damper xx
Light tower
Check if mast cables are not frayed or damaged. Replace immediately if
damaged.
x
Check support connection bolt of projectors xx
Check adjustable plates condition xx
Check electrical cable condition and upper fixation clamp xx
Grease the mast collar xx
Grease the mast adjustable plates (contact surface only) xx
Grease cylinder rotule xx
Change hydraulic oil xx
General
Inspection by Atlas Copco Service technician x
Light towers in stand-by application have to be tested on a regular basis. At
least once a month the engine should run for minimum 30 minutes at a high
load (50% - 70%) that the engine reaches its operating temperature.
Maintenance schedule
Daily
50 hours after
start-up
Every 100 hours Every 600 hours Yearly
Service pack
- - - 1636 3105 95 -
00_00_HiLight B6+_EN.book Page 52 Thursday, September 2, 2021 11:50 AM

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atlas Copco HiLight B6+ Kd ESF and is the answer not in the manual?

Atlas Copco HiLight B6+ Kd ESF Specifications

General IconGeneral
BrandAtlas Copco
ModelHiLight B6+ Kd ESF
CategoryLighting Equipment
LanguageEnglish

Related product manuals