Avid S6 Installation Guide44
Installing Cable Sets in Large Configurations
Refer to the following diagrams for Cable Set installation examples for four-chassis (24-fader) and larger system configurations.
Numbers in the diagram indicate the type of Cable Set installation.
4-Chassis Systems
(See Figure 24)
1 Cable Set Large
2 Cable Set Medium
3 Cable Set Small
5-Chassis Systems
(See Figure 25)
1 Cable Set Large
2 Cable Set Medium
3 Cable Set Small
The recommended order for Cable Sets is to start with the furthest chassis (either far left or far right) from the switch using one
of the longest Cable Sets. Then work across the frame, connecting the switch to the next channel chassis (to the left or right of the
first chassis you connected) and repeat for every chassis except the master section chassis, which should be connected last.
Figure 24. Cable Sets in a 24-fader (four chassis) system.
Figure 25. Cable Sets in a 32-fader (five chassis) system
12 3 4 5 12 3 4 512 3 4 5
1
2 2
3
1
2 2
1
3