Periodic Maintenance AVL 4000
1-2 Service Manual
1.2 Maintenance Plan
To ensure that the tester always functions properly, maintenance must be carried out at
regular intervals.
Maintenance work
Daily
Weekly
Six-monthly
(minor maintenance)
One a year
(major maintenance)
Comment
Entry in main-
tenance log book
Leak test

Automatically required
by tester every day
Filter replacement
Pre-filter on probe

Particulate filter

Condensate filter

Activated carbon filter
Replace in good time
when soiled by HC
vapour (e.g. petrol
vapour).
Cleaning
Probe and hose

see Operating Manual
Condensate pump
(cleaning kit)

see Operating Manual
Calibration with calibrating
gas
as per statutory requirements
Replacing O
2
sensor
Replacement is
requested by tester
Replacing NO sensor Replacement is
requested by tester
Visual check of outside

Check using software
Service engineer
Software update (as required)
Service engineer
Open tester, visual inspection
of PCBs, clean, close housing,
seal with service seal
Service engineer

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the AVL DiGas 4000 and is the answer not in the manual?

AVL DiGas 4000 Specifications

General IconGeneral
BrandAVL
ModelDiGas 4000
CategoryTest Equipment
LanguageEnglish

Related product manuals