Banner AG4 Series Safety Laser Scanner
6. Safety System Testing
Study each procedure in its entirety, to understand each step thoroughly before beginning. Refer all questions
to a Banner applications engineer, at the address or numbers listed on the back cover of this manual. Checkouts must
be performed as detailed in Section 6.1 below and results must be recorded and kept in the appropriate place (e.g., near
the machine, and/or in a technical file). This must include a printout of the Scanner’s configuration and the shape of all
Protective Fields.
Additional factors and checks may be required that are dependent on the application, machine, or local regulations and
laws. A user risk assessment will determine what these additional factors and checks will be and should be incorporated
with the checkouts below. For easy reference, print out the procedures and post them near the
machine/application.
6.1 Schedule of Checkouts
Trip Test: The procedure for Scanner trip test is described in Section 3.4.3. This procedure must be performed at
installation, and at any time the Scanner, the guarded machine, or any part of the application is installed or altered. The
procedure must be performed by a Qualified Person.
Commissioning Checkout: Perform the procedure described in Section 6.2 at installation or whenever changes are
made to the Scanner configuration or to the machine being guarded. The procedure must be performed by a Qualified
Person.
Shift/Daily Checkout: Perform the Daily Checkout procedure, described in Section 6.3, at each shift change or
machine setup change, whenever the System is powered up at least daily. The procedure may be performed by a
Designated Person or a Qualified Person.
Semi-Annual Checkout: Perform this procedure, described in Section 6.4, every six months following installation. The
procedure must be performed by a Qualified Person.
NOTE: The Shift/Daily and Semi-Annual Checkout procedures are also found on Banner document p/n 147899
(contained on the installation CD).
WARNING . . . PERIODIC CHECKOUTS
The commissioning, periodic and daily safety system checks must be performed by appropriate personnel at the appropriate times in order to
ensure that the safety system is operating as intended. Failure to perform these checks may create a potentially dangerous situation
which could lead to serious injury or death.
Buy: www.ValinOnline.com | Phone 844-385-3099 | Email: CustomerService@valin.com

Table of Contents

Other manuals for Banner AG4 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Banner AG4 Series and is the answer not in the manual?

Banner AG4 Series Specifications

General IconGeneral
BrandBanner
ModelAG4 Series
CategoryScanner
LanguageEnglish

Related product manuals